scott hamilton
Petty Officer 1st Class
- Joined
- May 28, 2002
- Messages
- 215
Thanks for all the continued advice waterman and SHSU . Got the pads constructed and set for the tank. 3/4 inch ACX coated in US composites thin resin and 3/4 inch closed cell neoprene. This will hold the tank about 1/4 inch above the ribs. I'm also installing a similar pad on either side of the tank to lightly hold against the stringers. Installed (dry fit) the bow pieces. I'm hoping to have the tank permanently installed this weekend and continue on cutting floor pieces. Its also time to figure out the console.
Attachments
-
photo338740.jpg496.2 KB · Views: 17
-
photo338741.jpg529.5 KB · Views: 16
-
photo338742.jpg590.3 KB · Views: 15
-
photo338743.jpg588.3 KB · Views: 16
-
photo338744.jpg563.2 KB · Views: 14
-
photo338745.jpg585.2 KB · Views: 86
-
photo338746.jpg632 KB · Views: 13
-
photo338747.jpg589.2 KB · Views: 13
-
photo338748.jpg632.2 KB · Views: 11
-
photo338749.jpg640.7 KB · Views: 15