Search results

  1. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    We finally had a warm day without rain the I could get away from the office. So She got wet after all this time! Good thing I like her after all this work....its the first time I have actually driven her! Overall everything went well I have a small water from the re-circulating pump but I...
  2. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Eh I think I will try to adjust it GM! But I am sure you are right! Found the issue, and for once I was dead on! Ordered the new gasket and the hoses while I am at it. Hopefully get it put together one night this week and try again!
  3. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    quick update, I glued in the carpet in the side pockets....then cut out the filberglass angles that I use to mount the seats. I located and glued one angle to the deck for each of the front seats (back seat angles are already installed.) Once those are dry tomorrow, I will screw the seats in...
  4. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    I finally had a little time on the boat tonight. I cut out and fit the carpet for the back pockets.....just a lot of time consuming cuts and fitting. I didn't have enough glue to install them, need to pick up some glue tomorrow. After that it is install the seats and breakin the cam. If that...
  5. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Thank you for the complements! I am worn out time for a shower and some food! But I did get the carpet in the front two side compartments and covered the toe kicks......glad to see the front end buttoned up. Next up is the two side pockets, later this week sometime,
  6. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Lol well I made some progress today. The deck carpet was a bit of a chore but got it installed and glued down. Had the ac on, spraying away with 3m Super 90 glue, and a really nice pink elephant showed up to help......put my respirator on and continued lol! Still have the 4 side...
  7. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    I painted in front of the toe board, under the upper deck tonight. I may still put some carpet up there later, more like a veco in with a hemmed edge. I used bilge coat. My sign friend showed up today with custom decals! Some for the steering wheel and some for the stern drive. I really...
  8. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Thanks Chuck! Work got in the way this week but I did get the seat bottoms varnished and the toe boards complete other than carpet. I then carefully closed the hinge and put double sided tape on the top of it. I then carefully sat the seat bottom in place where I wanted it and stuck it to...
  9. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Thanks for the complements! But lets make sure it doesn't sink first lol. I did get a lot of stuff crossed off the list. The main pre-splash items are the finishing the front seats and installing the carpet (want to do that before installing the front seat brackets) I located, installed the...
  10. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Thanks guys! I didn't get a full day in today, had to watch my Sooners! BOOMER SOOONER! nice way to start the season. I did get some Fuggly time after the game. I finished up the Pre-Engine start list and a few things on the Pre-Launch list. Hooked up the shift cable, installed the new...
  11. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Thanks Kcassells. I didn't get a lot done today, still a bit weak. However I did get all of the battery hold down pieces ready to install. If you go back about a million post, I installed the battery hold downs that I made out of seacast. They have stainless carriage bolts sticking up. The...
  12. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    I am sure there are a lot of things I am missing. but I wanted to make a list of things that I need to do in order to wrap it up. Blue is pre-engine start, yellow is pre-splash and the rest are when I get to it.
  13. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Thanks Wood I will check with them. Probably a this winter project, but I want to look into it before I install the pito pick up and tube. I sort of got the front deck drains installed tonight. I had a friend help hold the fittings on the outside, while I tightened up the jamb nut on the deck...
  14. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Tonight I drilled, installed and wired the socket for the stern light. I also put the hardware on the bow light and tightened it down. I still need to hook that up, but I want to get the bow deck braces (under the dash) installed before I flop around in there trying to do that. The back side...
  15. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    I put in the thru hull fitting for the bilge, installed and clamped the hose in place. I got the fitting jamb nut threaded almost all the way on, then hit a bur in the threads.....then it took two vice grips to get it off! Round two went quite a bit smoother, but it took 3 times as long as it...
  16. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Ok, I ended up getting a new phone....but did manage to sneak off to the lake Thursday and stayed till yesterday. Gave Miss Morgan a good workout! Here is a pic of the completed fuel system...except I forgot the rubber mat under the tank! Oh well 30 minutes one night and I can get that...
  17. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    Almost got the fuel tank in today. I started out by installing the line from the fuel pump to the carb. Next I drilled and installed the vent in the upper transom. At this point i realized that the vent hose needed to go thru the old vertical section of the rear deck that I left in place. At...
  18. archbuilder

    Project Fuggly - No Longer Fuggly And Splashed!!!!!!

    I worked on the wiring and fuel system today. Oddly I spent a lot of time moving around wires, figuring out how to route the fuel sending wires, and hoses. I also took the fuel pump out after I sorted out the fuel line routing and put in the fitting for the (hopefully) final time. I spent a...
Top