PC on the Bayou
Petty Officer 1st Class
- Joined
- Apr 27, 2020
- Messages
- 234
During the week, I received the rest of the parts to get everything back togerther. New water pipe and grommet for through the transom, new poppet ball valve for the cooling system, new exhaust manifolds.
Spent a couple hours yesterday evening and got the water pipe and hose on outdrive installed.
This morning, I installed all of the bellows, the gimbal housing, and outdrive. Other than positioning and tightening clamps it wasn't that bad.
This evening or tomorrow i plan to install the manifolds.
One other thing, I got a plumbing pressure test gauge setup and repressurized my block to 16 psig. It held for hours. As a matter of fact, this morning it still had only dropped 1-2 psi. I am pretty confident that my block is OK.
Spent a couple hours yesterday evening and got the water pipe and hose on outdrive installed.
This morning, I installed all of the bellows, the gimbal housing, and outdrive. Other than positioning and tightening clamps it wasn't that bad.
This evening or tomorrow i plan to install the manifolds.
One other thing, I got a plumbing pressure test gauge setup and repressurized my block to 16 psig. It held for hours. As a matter of fact, this morning it still had only dropped 1-2 psi. I am pretty confident that my block is OK.