Re: 16' Nescher ski boat complete restore- SPLASHED!!
I managed to get a lot done today, but it may not look like it! I started out cleaning up the shop some, the built a jig to glue up the swim platforms .....
let me back up, actually I went by a friends shop first thing to pick up some Alupanel....its used in the sign industry and may solve a lot my tank cover problem. After that I stopped by the new Northern Tool store......I had to get out of that place, man its a crack store for sure! I almost talked myself into a 20 ton press while I was there!
Here is the "jig" with the mock up on it. I can't tell you how handy the mock up was as reference for cutting the "cost as much as gold" teak, as well as building the support jig. The main problem was getting all the pieces aligned and clamped. Here is what I ended up with.
After that I carefully cut up the teak to maximize the yield.
I also made a cut list for the lengths and stacked each piece on top of the corresponding piece on the mock up as was cutting. I worked from longest to shortest.
Here is the first platform clamped up and drying. Tomorrow I'm going to clamp up the second one and start finishing the first one.
By the way, does anyone have any suggestions on a mat finish for the teak? I'm thinking something I can rag on would be best.