GSPLures
Chief Petty Officer
- Joined
- Sep 3, 2019
- Messages
- 564
Well I got of work early and got the rest of my string guides laid out.
I also Joined the ply together to get my stringer length. I cut the ply to 12" so I have plenty of wood to work with I cut a 6 to 1 angle for the final height of the stringer and then joined them together. I am a little bit apprehensive of the joint because I cannot add a bulkhead where they will be due to the ski locker.
My thoughts are to double up the stringer where the joint is on the outside of the stringer so it is not in the way of the ski locker then double up the glass on the inside. I am also going to offset the joint on the opposite stringer by about a foot. I'd rather a joint not be near the motor so I do not want to go further back with the joint.
I also Joined the ply together to get my stringer length. I cut the ply to 12" so I have plenty of wood to work with I cut a 6 to 1 angle for the final height of the stringer and then joined them together. I am a little bit apprehensive of the joint because I cannot add a bulkhead where they will be due to the ski locker.
My thoughts are to double up the stringer where the joint is on the outside of the stringer so it is not in the way of the ski locker then double up the glass on the inside. I am also going to offset the joint on the opposite stringer by about a foot. I'd rather a joint not be near the motor so I do not want to go further back with the joint.