Mark72233
Ensign
- Joined
- Jul 11, 2014
- Messages
- 926
Sunday I was finally able to start putting things back into the boat. :clap2: Cut and dry fitted my clamps and transom. Mixed a thick batch of hairy peanut butter first and filled in the holes I made while grinding, yes holes I did it 3 times:facepalm::laugh:. The hairy PB I made with 500ml of resin, a small cup of hand torn CSM, 30ml of the 1/4" chop strand, 750ml of Cabisol for thickener and 1% on the hardener. The 1% was a little slow to kick but this was at night and about 75*. Then I mixed 2 batches of PB ahead of time leaving out the hardener and about 25% of the Cabisol. This let me add the hardener to the first batch and still be able to mix it before I added the rest of the thickener (Cabisol). With the second bucket already mostly mixed it made transitioning to the second batch easy and quick. The batches were 1500ml of resin, 120ml of 1/4" chop strand, 1750ml of Cabisol and 1.5% on the hardener. It was about 88* Sunday and it gave me plenty of time to work with it.
The duct tape is covering all the holes made over the past 42 years from 2 sets of trim tabs, 3 different bottom machines and speedos, 2 swim ladders and a swim platform.
The duct tape is covering all the holes made over the past 42 years from 2 sets of trim tabs, 3 different bottom machines and speedos, 2 swim ladders and a swim platform.