- Joined
- Jul 23, 2011
- Messages
- 49,768
its been almost 5 weeks since I have been able to work on the boat. its been raining like crazy every day. finally was able to get the bulkhead between the cockpit and berth replaced and the gunwale sides filled in between rain showers on Sunday.
yard has 8" deep ruts from me pulling the boat out
pics of the rotten original bulkhead - 3/4 marine ply with a laminate.
the new bulkhead secured with screws, hairy PB, and tabbed in place.
the foam core that I adheared with great foam window and door (low expansion, works great as a glue) and the final gunwale storage pocket.
also did a bit of cleanup where the rub-rail goes with a wire cup brush in the grinder
yard has 8" deep ruts from me pulling the boat out
pics of the rotten original bulkhead - 3/4 marine ply with a laminate.
the new bulkhead secured with screws, hairy PB, and tabbed in place.
the foam core that I adheared with great foam window and door (low expansion, works great as a glue) and the final gunwale storage pocket.
also did a bit of cleanup where the rub-rail goes with a wire cup brush in the grinder