Still working slowly but surely. This is a combination of two weekends to cut everything out and dry fit. Did a lot of measuring and remeasuring to get everything as close as possible.
Made a template out of cardboard for the front of the consoles.
I was happy with how they came out. I added the holes so I could place my deep cycle batteries under there and still be able to get to them.
Don't remember whose thread I saw this one, but remember another Starmada Member doing this to get the lengths for the front seating area. Printed out a protractor and measured every 10 degress to get the distance to the Hull and inner support. This idea worked OK, but still had some areas that weren't quite right.
Dry fitting
Final Design with mini Admiral giving her approval
Been kicking around a front pedestal mount and how i would get it in. Took the scrap from what I cut out and added another board on top with a 2 inch lip. Will have to figure a way to secure it for travel, but know that wont be to hard. It gives a strong base for anyone fishing up front
Currently have my Welder working on the custom splashwell and hope to have that this week. Once I got that, I will be moving the boat to my folks so I have room in my garage to Seal/Epoxy all the wood.
Question,
For the front deck and the front of console, what are people's opinions on using stainless steel screws vs rivets to secure them to the Hull/Console?