waterwezl
Petty Officer 2nd Class
- Joined
- Apr 5, 2008
- Messages
- 104
Re: Progress so far...
Got a new plan of attack. I'm using the mat that I have to run down the sides of the stringers and onto the hull about 3-4 inches. I assume this is what ya'll mean by "tabbing in." For some reason it makes inside corners but refuses outside turns.
When that cures I'll cap it with the 1708 the full height of the stringer. I don't need to take it down onto the hull floor.....do I? I also think I'll be using the mat to smooth out the bilge. It's really rough in there....been that way since it left the factory. I want the water flowing out of it smoothly.
Thanks guys.....more pics to come.
Jason
Got a new plan of attack. I'm using the mat that I have to run down the sides of the stringers and onto the hull about 3-4 inches. I assume this is what ya'll mean by "tabbing in." For some reason it makes inside corners but refuses outside turns.
When that cures I'll cap it with the 1708 the full height of the stringer. I don't need to take it down onto the hull floor.....do I? I also think I'll be using the mat to smooth out the bilge. It's really rough in there....been that way since it left the factory. I want the water flowing out of it smoothly.
Thanks guys.....more pics to come.
Jason