Got my floor pieces patched over a few air bubbles, didn’t get the edges done but can do them closer to installing the floor. Did get the boat mostly sanded where I will be joining the new floor with the gunnels. So in pretty good shape for tomorrows move inside to my garage. Still need to remove transom wood, clean up the opening for installing the new transom, and tie stringers into the new transom, including carrying on the center stringer to the transom after I remove all the old engine mounts. Clean some old wood deck off the tops of the fiberglass stringers, And a little cleanup along the sides so I get a good floor fit.
Also got a old pump out head hole, in the hull, a sink drain, and I assume a supply hole by the sink, and another side hole by the driver station, not sure what that was for. Head hole I could patch and get rid of it entirely will never use it, I like the sink and might stick a pump on the supply hole for water to clean all those fish I’m going to be catching. And probably seal the hole by the drivers station, again no clue what it might have been for. Any ideas out there of its use?
Thinking in print listing the to do’s. Another day tomorrow.