GOT IT ON CRAIGSLIST FOR 800 COMPLETE WITH THE FLOORS TAKEN OFF. GOING TO BE REDOING STRINGERS, FLOOR, MOTOR, AND AFTER EVERYTHING IS DONE CLEAN AND REDO SOME OF THE BAD INTERIOIR. HERE ARE SOME PICS.
after most of the foam and stringers were removed
the transome
engine back from the machine shop
heads
Re: My 1994 wellcraft eclipse 210s overhull.
Worked for about 8 hours today. Got most of the foam done and installed gas tank and screwed,glued, and pb the sides of the floor. Also got the pistons back finally so will start building Monday. I have aliitle of everything on my body. Foam,glue,resin,pb.