Re: hull extension in progress with picks
Re: hull extension in progress with picks
the last pic i put up was of the shifter being put into place.....wow....that was a long time ago !
lots has been done....the sad part is.....you cant tell !....lol.
here is the boat about a month ago.
its time to get to the instlation.....so the transom sheild was finally installed.
at this point....the trim sensors are still not in place. but i was glad to start to re assemble the boat......note the steering ram is not there.
the outer gimbal housing was finally permanently installed.
the candidate motor is a 350 chevy that i had professionally built for my cube van.....
it is a LT 1 vette motor....4 bolt mains....rv cam...either 8.5 or 9.5-1 pistons (i forget ) it was built to drive up a huge mountain between here and vancouver at 100 kms per hr...(60 miles an hour) fully loaded......it did it...
it was running about 310 hp.....with the addition of a big holly carb and a hi rise manifold.....im guessing 320 hp now
its still kinda dusty.....but it will all get cleaned shortly.