More progress and pics:
Getting the primer sprayed on the walls and bow deck. Probably going to scuff and then get ready for primer. We're going to roll the floor (and add sand for grip), and spray the sides (for a smoother surface).
Halfway through construction of the sub structure for the raised deck. We connected the 3/4" plywood with 2"x2" pieces of wood that were 1/8" off the ground. 2 edges and both ends were epoxied, then, before installation, we applied peanut butter to help bond the plywood pieces. We used 2 screws per side. We then epoxied over the screws.
Some of the 3/4" pieces had a small gap between them and the floor (nothing is flat), so we got thickened epoxy under them and called it a day
Here's how we attached the sub structure to the floor. 1" aluminum bracket. 2 rivets and loctite PL for the vertical connections. 2 stainless steel screws for to attach them to the deck with copious amounts of adhesive.
All done and installed! (minus the piece that goes straight to the bow). need to get that one installed but we momentarily lost it lol.
We really wanted storage space up front, but obviously having this cut out really weakens the plywood. (the bowmost compartments will be filled with foam).
To alleviate the weight on the plywood, we added a cross member to transfer weight into the supporting pieces. Should be solid and good to go from here!
Also, the amount of dust created in here from the jigsaw was insane. Get those respirators!