SO, after reading back through WOG and BC's builds I've revamped my route here (I know a few of you are saying THANK GOD :laugh
This weekend's plans:
-CSM the bulkheads one side at a time, then stand them up and use the drop cloth to smooth the edges with a 3rd separate piece of CSM
-Get the transom PB'd in and filleted, if it hardens up in time I'll end up tabbing that before Sunday is over
-By the time the transom is finished the bulkheads should be less tacky, so I'll move on to PL glue the bulkhead joints to the stringers, so it can all be inserted as one piece
-Fillet the PVC pipe and PVC sheet (using for the U-bolt at the stern)
-Enjoy some Miller Lites
Once the transom is done within the week I'll look to PL the stringers/bulkheads in, let that cure for a few days and then start working on stringer fillets.