ok, time for an update, we have been working on the boat for 2 afternoon and 2 evening since the last post.
at first we tought about saving the starboard side of the boat stringer and deck + seat box. this was where we stoped
after some rest, readings and brainstorming we decided to remove the starboard side of the deck and stringer altough it was not rotted.
the idea is mainly to rebuild the boat in a symetrical way on port and stdb side so off it go
after investigation on the cabin bulkhead we found that the very poor sealing of the cabin drain allowed water under the cabin floor.
this is the "drain collector" , it was not very glassed and even not glued to the hull, i could almost pass my finger between the wood and the poly of the hull.
plus the drain pipe was not connected properly to this cavity, it was about 10 inches too short
so in the end we completely removed the cabin floor. fwd section was dry, rear one started to rott. black water traces clearly visible on the hull.
The undertank floor was removed too. although it felt really solid it was a total mess under the glass. again very poor sealing from factory
It is where we where after about 10 hours of work