Thanks guys!
Picking up the pace now!
Here's how I'm working around the temperatures in NY, got the inside up to 90 degrees.
Got the deck epoxied in! Wish I took more pictures of the process but I was trying to work as quick as possible, I had a friend spread thickened PB epoxy (West System 105,205,404) along the edges while I used a bakers bag filled with PB to spread epoxy on the stringers/bulkheads. I first laid down some regular mixed epoxy on top of the stringers for the wood to wick in, let it slightly set off, then spread the PB on top for the deck. Luckily where I'm working on the boat is a set shop for NYC Broadway plays, so I had access to over a thousand pounds of weights for my deck. I did use screws for the stringers, plain wood screws. I pre-drilled, counter sunk, used a syringe to inject epoxy, then impacted the screws in, gonna cover holes with PB before I lay glass on the deck.
"I get by with a little help from my friends"
Finished product, OH YEAAAAH. This feels really nice. I've been meticulous this entire process, which is quite draining, feels nice to see the semi-finished product turn out just about perfect.
17oz Double Bias (no mat) tabbing, this stuff really sucks a lot of epoxy up, it takes a good bit of babying to get it filled up with epoxy, and I always end up over shooting and using TOO much epoxy per the layup, not really worried about it though, just money down the drain!
Finished, cured tabbing as of this morning
and a bit of tabbing on the aft, going to be adding more this weekend.