Okay!!! I actually have some progress pictures to report. Now I know they really look like some others I've posted. But honestly they are new with a lot of little things accomplished. I pushed myself to work in the heat to try and make some real progress and I finally think I'm about ready to seal this puppy up now. I managed to drill the holes for the black tubing to fit now and also cut the PVC pipes to the proper length and even removed one section because the live well hoses didn't go as far forward as I initially thought. So that is now taken care of as well. So everything I can presently think of is finished under the floor. However I haven't drilled the pour holes for the mix and pour foam. And that leads me to a good question. Do you all think it would be better to take the time now and drill all those holes and then button up the floor, or wait and drill them after the floor is intact? Reason I ask is because I can easily line them up now and drill them out of the hull with relative easy and not have so much mess later in the hull. I just don't know if there is a better way to do that...just asking. I guess one of my real fears is to PB the floor in place and think of something I didn't do and have to cut section up again. I know that sound stupid, but it really makes me hesitant at this point. Anybody else even have the worry? :noidea:
Anyways here are the pictures with every thing but the wipe down ready otherwise. I have plans to not use any screw fasteners but a lot of concrete blocks to hold each section until they cure, being how the floor sections are totally flat now and fit perfectly. Good idea or not?
I used some pieces of wood to hold up the sections so I could work under then to get the correct lengths of tubing cut and fitted.
I rear view and you can see the one black tubing laying there.
At the fro9nt of the hull there is a section without a OVC pipe section. That is because the trolling motor battery is in that section and will feed from and rear with power cables when finished.
If you look real close, you can see where I cut out two PVC sections for the live well. I Initially had the PVC pipe going up to the next bulkhead and that was too far forward so I had to remove them and PB over the holes.
And finally a straight front to rear shot. You can see little holes in the bulkheads that I already waterproofed before installing the tubes. Those holes are for the seat boxes and live well lights. There are also cross holes drill so I can run tube and wires for the rod box lights as well. So unless I am really forgetting some, I think it is time to PB this puppy together... IDK! :noidea:
If you guys can think of anything I may have missed, Please let me know. Tomorrow, hopefully, is the PB floor time...unless you can think of something else I really need to do first... :decision:
I wish you all a wonderful evening... :thumb: