Hi everyone,
Well I have started the teardown on my spring purchase. Have been reading the forum for some time but have not posted anything since spring last year.
A few questions. My floor was 1/2" but since I am 250 Lbs thought 3/4" CDX replacement encased in epoxy would be better. Am I right? What about rivet holes lining up on everything? Does it matter? I am also timid about pulling the transom. How much trouble is it to remove after all those screws have been removed. Does the sealant make it tuff?
If weather improves today as forcast I might try water testing it either in my driveway by filling with a hose or taking it to the local creek (1 mile away). Anything I should look for other than leaks?
I'll post more pics as the project progresses.
Well I have started the teardown on my spring purchase. Have been reading the forum for some time but have not posted anything since spring last year.
A few questions. My floor was 1/2" but since I am 250 Lbs thought 3/4" CDX replacement encased in epoxy would be better. Am I right? What about rivet holes lining up on everything? Does it matter? I am also timid about pulling the transom. How much trouble is it to remove after all those screws have been removed. Does the sealant make it tuff?
If weather improves today as forcast I might try water testing it either in my driveway by filling with a hose or taking it to the local creek (1 mile away). Anything I should look for other than leaks?
I'll post more pics as the project progresses.