Beachcraft170E
Seaman Apprentice
- Joined
- Jul 8, 2021
- Messages
- 37
So at this point in our recap, it's late November, and I started the build in late June, so right at 5 months worth of pretty obsessive work, when I'm not at regular work. In hindsight, it cracks me up how close I thought I was at this point. I figured a wash, cut and rub the gelcoat, pop the interior in and we're on the water baby. Oh my young, naive self. Now I realize that about every 3 weeks I say, "about 2 more weeks." Anyway, I figured better start on the gelcoat. It had some keel rub, as I mentioned earlier, some big gouges, lots of rashes and dings, and oxidation. There were also holes to repair and the glove box area. I spent a fair amount of time on it, and though it's far from perfect it has really come out nicely.