Got the snaps done the new velcro on.
Top looked better the longer it was on it got to find it's new shape some still. After it was on 15 minutes it looked better and was loose again, I figure it gonna have to be tightened up like that for a while. Got the pole for the bow cover with a snap on it finished to.
First pics look alot like the last set except this time they held on with snaps and not tape. Last few were the crunchy old bow cover and it being sent off to Davy Jones locker. See Ya Woudn't Want To be Ya.
Now get ready for the next blizzard tomorrow LOL. 60 now they saying 2 to 4 inches to be safe but up to a foot.
Last 2 pics are weather ones.