OK! got a quick question, Im getting ready to glass my stringers, they're all tabbed in to the hull with 6" and 8" tabbing of 1708. I'm going to do each side with 2 layers of 1708 and then cap them. My question is this, do I need to run the layers down onto the hull or can I just overlap an inch or 2 of the tabbing and then run it up to the top of the stringer? My stringers are approx 10" and 14" tall.