gazza2007au
Chief Petty Officer
- Joined
- Mar 9, 2007
- Messages
- 429
A fair bit of work being done my floor is down my edges have been filletted, it has been sanded and now fibreglassed with 1 layer of what us aussies call 400gram a meter double bias i think you guys call it stitched biaxial
Im giving the entire floor a sand tonight and getting it ready for the second and last layer of cloth
Im giving the entire floor a sand tonight and getting it ready for the second and last layer of cloth