found ya , ride'in along
OK, thought we had lost you for a while.
My fiberglass, epoxy resin, and tools all arrived, so I am good to go for the weekend.
The plan for Saturday is to . . .
1) Cut out the insets for the swim ladders and form the hatches to cover them.
2) Install a 'bottom rim' around the stern edge of the plug. This will serve as a mounting area for rubrail in the finished platform.
3) Final shaping/sanding
Then Sunday . . .
1) Apply epoxy and glass to the plug
Monday, it will be back to work
I think I'll get some time in over the long Thanksgiving weekend to do some sanding/finish work on the plug.
I'll have to get some 'non-skid' material ( :noidea: ) at that point to finish off the plug.
Then it is onto making the mold from the plug.