3M 5200 vs Liquid Nail

MR nova @#25

Petty Officer 2nd Class
Joined
Dec 7, 2011
Messages
149
floor 3.jpg floor.jpg floor 2.jpg Every piece of wood in the hull was replaced. to include the bulkhead forward of the porto poti.
 

MR nova @#25

Petty Officer 2nd Class
Joined
Dec 7, 2011
Messages
149
floor 3.jpg floor.jpg Every piece of wood in the hull was replaced. to include the bulkhead forward of the porto poti.
 

MR nova @#25

Petty Officer 2nd Class
Joined
Dec 7, 2011
Messages
149
GetAttachment.jpg deck.jpg deck2.jpg The deck is standard plywood with one layer of WR. The side strips were coverd with Heavy Matt.Once I get this all cleaned out, Whats the best way to put in back together??
 
Top