Found a soft spot in the ski locker and now I have removed the deck from the hull the whole floor needs to be replaced it looks like the ski locker has been replaced before i cut out the floor where the replacement was installed and found a cross board was cut out but not sealed and what wood was in the stringers is rot now the stringers they seem to be half foam filled has any one worked with this type of stringers and have any advice for me thank you CIMG4525.jpgCIMG4526.jpgCIMG4527.jpg
 

Woodonglass

Supreme Mariner
Joined
Dec 29, 2009
Messages
25,932
Re: 1999 200s Wellcraft

Welcome to iBoats!

Foam filled stringers are fairly common. Can you tell if it is Wet or Dry? If wet, I'd recommend cutting the top off the stringers, removing the foam and repouring it. You could fabricate bulkheads using the poured foam and glassing them in as well. Need a larger pic of the deck area and possibly draw some lines in where you want the ski locker and bulkheads to go.
 

sumpenelse79

Cadet
Joined
Jul 16, 2009
Messages
11
Re: 1999 200s Wellcraft

I have cut out more of the floor and found the stingers are wooden box filed with foam and the wood is wet so I'm going to pull the whole floor i hope that i don't have to pull the motor it is a new engine that i just put in. The hole that you can see in the stringers is a cross board to help hold the floor on the deck see pics CIMG4533.jpgCIMG4536.jpgCIMG4531.jpg
 

sumpenelse79

Cadet
Joined
Jul 16, 2009
Messages
11
Re: 1999 200s Wellcraft

the ski locker the cross board that holds the deck floor
 

Attachments

  • CIMG4536.jpg
    CIMG4536.jpg
    131.2 KB · Views: 0
  • CIMG4533.jpg
    CIMG4533.jpg
    137.4 KB · Views: 0

sumpenelse79

Cadet
Joined
Jul 16, 2009
Messages
11
Re: 1999 200s Wellcraft

Ok now i have removed more of the floor and found that this boat only has one full bulkhead and a half in front of the engine to hold the fuel tank in place all stringers are foam filled box the side stringers in the pic found wet foam in it so i thank Im going to cut the tops off the stringers but will remove the rest of the floor first if any one can help me with some idea's let me know thank you for viewing
 

Attachments

  • CIMG4532.jpg
    CIMG4532.jpg
    136.1 KB · Views: 0
  • CIMG4560.jpg
    CIMG4560.jpg
    143.4 KB · Views: 0
  • CIMG4561.jpg
    CIMG4561.jpg
    142.4 KB · Views: 0
  • CIMG4562.jpg
    CIMG4562.jpg
    151.2 KB · Views: 0

sumpenelse79

Cadet
Joined
Jul 16, 2009
Messages
11
Re: 1999 200s Wellcraft

sorry about the thumbnails here are the pic in full
 

Attachments

  • CIMG4525.jpg
    CIMG4525.jpg
    139.3 KB · Views: 0
  • CIMG4526.jpg
    CIMG4526.jpg
    130 KB · Views: 0
  • CIMG4527.jpg
    CIMG4527.jpg
    142.1 KB · Views: 0
  • CIMG4536.jpg
    CIMG4536.jpg
    131.2 KB · Views: 0
  • CIMG4533.jpg
    CIMG4533.jpg
    137.4 KB · Views: 0

sumpenelse79

Cadet
Joined
Jul 16, 2009
Messages
11
Re: 1999 200s Wellcraft

I have done more work over the weekend and some more pic I'm going too cut off the tops of the stringers next maybe one at a time but should only cut a section of the stringer at a time or the whole top off any info thank you
 

Attachments

  • CIMG4563.jpg
    CIMG4563.jpg
    127.3 KB · Views: 0
  • CIMG4564.jpg
    CIMG4564.jpg
    132.5 KB · Views: 0
  • CIMG4565.jpg
    CIMG4565.jpg
    133.5 KB · Views: 0
  • CIMG4566.jpg
    CIMG4566.jpg
    146.3 KB · Views: 0

n8ve1

Cadet
Joined
Aug 22, 2012
Messages
14
Re: 1999 200s Wellcraft

Looks like you are making good progress. Don't really look like there is much foam down there. Cant wait to see the tops off.
 