As I am sitting here watching some playoff hockey I can stop thinking about all the work that still needs done. The list is, 3 more coats of epoxy on the floor, vinyl the floor pieces, finish drilling out leaking rivets, replacing leaking rivets, gluvit each rivet below the water line, cut new foam, install new foam, install floor, vinyl consoles, put consoles back together, install consoles, install front bow storage area, in stall gas tank, install interior carpeted sides, install seats, clean or replace spark plugs, change lower gear lube. So much to do!!!