Well, not exactly the best news to report today. The boat's been in the shop to have the engine installed for the past week and a half or so. He finally got to my boat yesterday, but my mount was 2" too tall. So, if you've read my earlier posts, I described how I came up with the height taking measurements in relation to the donor boat's keyhole, that method didn't work. The only reason that comes to mind is that the transom on the donor boat might have had a different angle. Nonetheless, it didn't work and now I know it needs to come down two inches. He did say the width and length worked fine.
So, I went home, disassembled and proceeded to mutilate my timber with my table saw... You have to make two passes with a timber that thick. Now, I have a new 3x5 inch timber on order, and I feel pretty good about getting it put back together once it gets here, and, according to the mechanic this height change should do the trick, about three weeks for delivery.
Meanwhile, trying not to lose what little time is left to work on it this year, I've shifted focus to bilge ventilation (which needs to go in before decking does) and I ground down some rivets on the top of the cabin that will eventually be in the way when I install the new windshield.
So not the best news. I feel like I did what I could, everything I know to do, so it's not bothering me too much that the mount wasn't the right height. I gave it my best but it still sucks being out a $250, chunk of teak...