Andy in NY
Commander
- Joined
- Oct 25, 2007
- Messages
- 2,109
Re: Starcraft project: "STOLEN" PIC UPDATE 7-21-09
Re: Starcraft project: "STOLEN" PIC UPDATE 7-21-09
Well guys, its officially crunch time. t minus 24 hours.
last night all i really got done was the bilge pump wired up, but not plumbed. seems when i redrilled the hole through the transom i used i size too small bit and the hose wont go through. no biggie.
i also got the splashwell draintubes in, as i was doing the second one my tube of 5200 EXPLODED in my hand... leaving a gooey mess that i still have not gotten off... so i picked up another tube last night and just have to lay some on the inside of the transom around the tubes.
i also picked up some stuff i needed like ropes, paddle, battery box, 5200 (actually its the atwood brand marine sealant), plugs, etc.
heres my punchlist:
registration (going in about 30 min to do that)
hose for bilge pump plumbed
seal inside of splashwell drain tubes
cleats
battery box
gas her up and go!!!
im as ready as i'll ever be. 10am tomorrow we hit the launch.
its wierd, i feel like i have been working on this boat for years... but really its been 6 weeks!!! remember this?? http://forums.iboats.com/showthread.php?p=2158648#post2158648
Re: Starcraft project: "STOLEN" PIC UPDATE 7-21-09
Well guys, its officially crunch time. t minus 24 hours.
last night all i really got done was the bilge pump wired up, but not plumbed. seems when i redrilled the hole through the transom i used i size too small bit and the hose wont go through. no biggie.
i also got the splashwell draintubes in, as i was doing the second one my tube of 5200 EXPLODED in my hand... leaving a gooey mess that i still have not gotten off... so i picked up another tube last night and just have to lay some on the inside of the transom around the tubes.
i also picked up some stuff i needed like ropes, paddle, battery box, 5200 (actually its the atwood brand marine sealant), plugs, etc.
heres my punchlist:
registration (going in about 30 min to do that)
hose for bilge pump plumbed
seal inside of splashwell drain tubes
cleats
battery box
gas her up and go!!!
im as ready as i'll ever be. 10am tomorrow we hit the launch.
its wierd, i feel like i have been working on this boat for years... but really its been 6 weeks!!! remember this?? http://forums.iboats.com/showthread.php?p=2158648#post2158648