Doing a one part paint job on topside of my 17 foot CC. Simple question I think.?
Do I run topside paint all the way down below water line then paint over with bottom paint? Or paint to a line and start bottom paint below.? I'll post pic
Do I run topside paint all the way down below water line then paint over with bottom paint? Or paint to a line and start bottom paint below.? I'll post pic