Well I finally got some time to work on the boat during the past few weekends, though progress is still pretty slow. We are renovating our kitchen so a lot of my free time has been sucked up by that project, but I really want to get the boat out on the water ASAP. I epoxied in my floor patch and put down a couple coats of thin epoxy on top to help seal up the exposed floor area, then after curing I laid down 2 coats of Valspar oil-based porch paint. I plan to use the same epoxy and paint for the plywood panels on the bench.
I installed a couple of studs in the floor where I plan to mount the bracket for a bilge pump. After the paint is dry I'll install my new dual battery trays and slide the gas tank back into place. Need to find some stainless brackets to hold the tank, the existing ones were all rotted out. After that I'm hoping to get the wiring done, I have stockpiled all of the supplies and now I just need to install them. I found a local tool rental shop that has crimpers big enough for my 2 gauge battery cables. Going to install new lights, horn, 12v outlet, and all the required wiring and switches and fuses.
I installed a couple of studs in the floor where I plan to mount the bracket for a bilge pump. After the paint is dry I'll install my new dual battery trays and slide the gas tank back into place. Need to find some stainless brackets to hold the tank, the existing ones were all rotted out. After that I'm hoping to get the wiring done, I have stockpiled all of the supplies and now I just need to install them. I found a local tool rental shop that has crimpers big enough for my 2 gauge battery cables. Going to install new lights, horn, 12v outlet, and all the required wiring and switches and fuses.