I'm building a floor hatch using polyester laminating resin, but don't have enough time to do the entire layup in one session. What's the maximum time I can wait between layers? Would one week be too much? I'm trying to avoid having to sand the surface between the layers. If it matters, the part will be made and stored in a warehouse that reaches 95 degreesF during the day.