My reapirman says I need an intermediate shaft for the lower unit of a 1973 65hp johnson elec shift. He wants $375.00 for the part. I found a complete lower unit on-line for $240.00 plus shipping. Would it be easier to install the whole unit or just the shaft? Any advice?