Colorado04
Petty Officer 2nd Class
- Joined
- Aug 29, 2005
- Messages
- 165
Hi All.
Im about to take on replacing the U joints in my AQ270. I have been able to figure out (through this forum) how to get it all apart execpt for seperating the U joint from the upper gear box housing. It looks like and reads like I need to remove the 4 bolts that hold the clamp ring in place (part 36 and bolt 37 on attached). Doing that will allow the U joint and a bunch of parts to come out of the housing still on the aft U joint shaft. Is this correct? If this is true, I plan to replace the fore and aft U joint crosses while all the bearings etc are stll attached. Then once done, can I just slide the complete U joint into the housing and secure the clamp ring and reassemble the rest?
Thanks in advance.
Donnie.
Im about to take on replacing the U joints in my AQ270. I have been able to figure out (through this forum) how to get it all apart execpt for seperating the U joint from the upper gear box housing. It looks like and reads like I need to remove the 4 bolts that hold the clamp ring in place (part 36 and bolt 37 on attached). Doing that will allow the U joint and a bunch of parts to come out of the housing still on the aft U joint shaft. Is this correct? If this is true, I plan to replace the fore and aft U joint crosses while all the bearings etc are stll attached. Then once done, can I just slide the complete U joint into the housing and secure the clamp ring and reassemble the rest?
Thanks in advance.
Donnie.