tommays
Admiral
- Joined
- Jul 4, 2004
- Messages
- 6,768
i have been replanking my FUBAR deck and needed to replace the railing which would have required buying 250 spindles <br /><br />i pull out the lowes add and there it is 6ft prebuilt railings for 31 dollars a section <br /><br /> i needed 15 sections that would have took days to build<br /><br />i got a new railing in 7 hours <br /><br />
<br /><br /><br />tommays