Can anyone tell me the best knot to tie loops throughout a length of braided dock line? I'm trying to set up spring lines so that I can run one line that has a loop on the dock cleat, another loop to go over the midsip cleat and then another to loop over the aft dock cleat. I'd do this on both the port and starboard sides. I tie up in a very open, very rough spot thats exposed to the prevailing SWers famous in my part of the world. I already know how to tie a linemans loop and a figure 8 loop in the bight. Both seem strong but hope to hear opinions from the experts. Maybe I should use two springs on each side?? Thanks