KarstRanger
Cadet
- Joined
- Apr 17, 2006
- Messages
- 15
I would like to be forewarned before I go check about this work at a couple marine shops here in Atlanta. Should I expect that the following job would take about 4 hours of mechanic's time? I have a pretty good handle on parts costs.<br /><br />I plan on having the following replaced: the three bellows, two hoses, the shift cable, and the trim limit switches and wires. I will get the newer exhaust tube vs. the bellows, also.<br /><br />Thanks !