Wasn't the primer cured, before the antifouling paint was applied? It should have been. Well that is water under the bridge now.
Epoxy paint curing time is based upon ambient temperature. The warmer the average temperature, the faster the cure.
The internet should provide instructions for using that epoxy paint. Just look it up. I would expect 2-3 days would cure epoxy in anything but the coldest temperature.