When installing the control cable, 1986 260, and you find zero position and turn 4 times?
do you turn 4 times to preload the cable and push the dogs tight or,
turn 4 times the other way, set the dogs loose, and let the dog hook pull it in? Thanks
do you turn 4 times to preload the cable and push the dogs tight or,
turn 4 times the other way, set the dogs loose, and let the dog hook pull it in? Thanks