I have a 72 18' Searay that I have put in a new floor. I am using epoxy and I'm ready to glass the deck. I'm going to use a think weave heavy base and then use a finer top. I have sealed the bare wood and sanded it to give it a rough finish so the top will stick.
My question is can I put both layers down and poor the epoxy over the top? Will it absorb it all the way through? Or should I do one layer at a time? I have the slow epoxy and it is about 65 degrees so I believe I have enough time to work it in.
My question is can I put both layers down and poor the epoxy over the top? Will it absorb it all the way through? Or should I do one layer at a time? I have the slow epoxy and it is about 65 degrees so I believe I have enough time to work it in.