bruceb58
Supreme Mariner
- Joined
- Mar 5, 2006
- Messages
- 30,478
Going to have engineered brazilian cherry wood flooring installed on a 20+ year old slab concrete floor. Contractor says he is going to use Bostik's Best but I am wonderring if I should also have him put down the Bostik MVP4 sealer first. I do not have a water problem and there is a vapor barrier under the slab.
Any thoughts?
Any thoughts?