GOT IT ON CRAIGSLIST FOR 800 COMPLETE WITH THE FLOORS TAKEN OFF. GOING TO BE REDOING STRINGERS, FLOOR, MOTOR, AND AFTER EVERYTHING IS DONE CLEAN AND REDO SOME OF THE BAD INTERIOIR. HERE ARE SOME PICS.
after most of the foam and stringers were removed
the transome
engine back from the machine shop
heads
after most of the foam and stringers were removed
the transome
engine back from the machine shop
heads