Alpha one gen II. Everything was going great today, finally able to work on the boat for more than an hour at a time. Installed new gimbal bearing, trim sender/limiter, bellows on transom side, new shift cable outer, going together like clockwork. Biggest pain was getting shift cable end through new bellows...about 10 minutes. Even getting water hose installed took less than 15 minutes for both sides. Couldn't have been happier.
Now the problem. Can't get retainer ring over u joint bellows. Have the tool. Used a little Power Lube...still no luck. Have hinge pins out so I can push the bell housing in.
Merc manual says to install the gimbal housing in first, then bell side. Now I'm seeing some say bell side first. I'm not sure what you would "push" against if you did bell side first. Anyway, I need help...suggestions...orders SOMETHING that will help get retainer in.
Push or Pound with tool???
thanks in advance!
Now the problem. Can't get retainer ring over u joint bellows. Have the tool. Used a little Power Lube...still no luck. Have hinge pins out so I can push the bell housing in.
Merc manual says to install the gimbal housing in first, then bell side. Now I'm seeing some say bell side first. I'm not sure what you would "push" against if you did bell side first. Anyway, I need help...suggestions...orders SOMETHING that will help get retainer in.
Push or Pound with tool???
thanks in advance!