just started this project a couple weeks ago and will post pics soon.
So far all the stringers and bulkheads are rotted and have removed alot of the foam. The pics will tell alot, LOL.
Am going to replace stringers and bulkheads along with the floor structure.
At this time i do not plan to put the foam back.
The boat will be awl griped and non skid applied to the floors. the cabin will be done in doug fir most likely with several coats of varnish.
The motor is a 260 hp mercruiser
So far all the stringers and bulkheads are rotted and have removed alot of the foam. The pics will tell alot, LOL.
Am going to replace stringers and bulkheads along with the floor structure.
At this time i do not plan to put the foam back.
The boat will be awl griped and non skid applied to the floors. the cabin will be done in doug fir most likely with several coats of varnish.
The motor is a 260 hp mercruiser